PARK / NETWORK CALCULATIONS
Calculations & Crossings
PARK evaluates crossings and special crossing elevations together during sewer and stormwater calculations. Elevations at each intersection are considered alongside recalculation and project-output arrangement tools.
01 / INTERSECTIONS
Automatic crossing detection
Intersections between sewer and stormwater lines are detected and framed automatically. Each intersection shows the crown elevation of the lower pipe, the invert elevation of the upper pipe, and the difference between them.
Crown elevation of lower pipe
Invert elevation of upper pipe
Difference between elevations
02 / RECALCULATION
Adjusting elevations for crossings
Sewer invert elevations can be adjusted with pipe diameters, slopes, and connection conditions taken into account. The network can be recalculated to resolve a crossing while locked elevations remain fixed.
03 / FIXED ELEVATIONS
Locking elevations at special crossings
For special cases such as road and stream crossings, upstream and downstream invert elevations of the relevant utility can be entered and locked. The full network can then be solved against these fixed elevations.
04 / DETAILS AND PROFILES
Crossing details and profiles
Crossings can be detailed using selected frame sizes, then placed in a separate drawing side by side and in sequence.
Sewer and stormwater profiles can be separated by construction phase and drawn in rows without overlap.
05 / SHEETS
Sheet frames and key plan
Automatic sheet layout creates sheet frames and layout arrangements for the chosen paper size. The key plan shows each sheet’s position within the overall project.
Available sheet sizes: A0 · A1 · A2